Infrastructure

Municipal Waste Contract Takeover

A major European municipal waste operator required a full-scope contract takeover covering collection, sorting, and recycling. Scope: 250+ vehicles, 3 MRFs, 1,200 staff. Fleet availability had dropped to 78%, and recycling recovery rates were below contractual targets.​

The Challenge

A major European municipal waste operator required a full-scope contract takeover covering collection, sorting, and recycling. Scope: 250+ vehicles, 3MRFs, 1,200 staff. Fleet availability had dropped to 78%, and recycling recovery rates were below contractual targets.​

The Methodology

  • Full transition management: staff TUPE, vehicle handover, site mobilisation​.
  • Fleet preventive maintenance redesign (km/hour-based cycles)​.
  • MRF process optimisation: NIR sorter calibration, throughput rebalancing​.
  • Route optimisation using dynamic planning and fill-level data​.
  • KPI governance with weekly operational performance reviews​.
  • Subcontractor scope rationalisation and performance management​.

The Results

  • Over 1,000 staff and a fleet of several hundred vehicles fully operational within two months, with no service disruption during transition.
  • Fleet availability improved by 15 to 20 points within the first year through structured preventive maintenance and parts management.
  • Sorting facilities optimized, with recovery rate improved by 5 to 10 points and less residual waste sent to landfill.
  • Route optimization cut fuel consumption and brought missed collections below contractual thresholds.
  • Cost per ton reduced across the value chain through combined fleet, route, and sorting gains, with benefits recurring year on year.
Inuo Contact Logo

Want to know more?