Infrastructure
Hazardous Waste Facility Takeover
The Challenge
A newly constructed hazardous waste facility — engineered landfill + rotary kiln incinerator — required independent asset condition assessment before EPC-to-O&M handover. Accepting with hidden defects would transfer millions in remediation liability.
The Methodology
- ISO 55000-aligned Grade 1–5 condition assessment across all asset classes.
- Defect taxonomy: category, type, and origin classification for every item.
- Photographic evidence and GIS referencing for all 2,800 assessed items.
- Criticality-based prioritisation of 142 identified defects.
- CAPEX remediation plan development with cost estimates per defect.
- Client validation process and EPC contractor negotiation support.
The Results
- Several thousand items condition graded using a structured assessment methodology, with a complete geolocated asset register.
- Critical defects identified and documented pre-handover, preventing hidden liabilities passing to the client.
- Remediation plan developed, validated, and used as the basis for contractor back-charge negotiations.
- Complete pre-handover risk registers with a prioritized remediation roadmap and full visibility on asset condition.
- Assessment methodology adopted as the client standard for subsequent handovers across the portfolio.
More Case Studies
More insights and articles
Case Studies
Large WWTP Takeover
MEA Region | Water Utility

Case Studies
Assisting a rental equipment company in managing operational challenges during rapid expansion
With hundreds of agencies spread all over France, being Head of agency had become a challenging position.

Case Studies
Municipal Waste Contract Takeover
Europe | Collection, Sorting & Recycling